Clarification#1 about Upgrading of Dahla Multipurpose Dam project

mew-admin
1

Assignment Title: Review, Verification and Technical Certification of the Detailed Design of Dahla Dam Raising, Two Spillway Packages, Six Saddle Dams and Associated Work

 

Project ID: MOWE/1405/ICB/C-2755

 

The Ministry of Water & Energy received some questions from consultants regarding relevant assignment for the Upgrading of Dahla Multipurpose Dam project. Therefore, all interested bidders may take the following given clarifications into their consideration while preparing their Expression of Interests.

No.

Consultants’ Questions

(MOWE)’s Responses

1

We would like to kindly request clarification regarding the qualification requirements stated under Section 17 – "Minimum Qualifications of the Consulting Firm" 

The TOR requires the consulting firm to have successfully completed at least two assignments within the last ten years involving independent design review, dam-safety assessment, or detailed design of large dams and major hydraulic structures.

In addition, the following requirements are specified:

  1. At least one assignment involving the raising, rehabilitation, or major modification of an existing large embankment dam;
  2. At least one assignment involving a high-capacity spillway and energy-dissipation and/or scour-protection works;
  3. Demonstrated experience with saddle dams/dikes, PFMA, dam-break analysis, instrumentation, and dam-safety plans;
  4. Demonstrated hydromechanical design and/or review capability for large gates, hoists, valves, stoplogs, and embedded parts;
  5. Demonstrated electrical review capability for dam station services, protection systems, switchgear, PLC/SCADA, cabling, grounding, and emergency power systems;
  6. A documented corporate QA/QC system and professional indemnity insurance meeting the RFP requirements.

In this regard, we kindly request your clarification on the following points:

  • Whether each of the above technical qualification and experience requirements must be demonstrated through separate and different reference projects;
  • Whether a single reference project may be used to demonstrate compliance with more than one of the above requirements, provided that the relevant scope of work was included in that project;
  • Whether the requirements may be satisfied cumulatively through several different reference projects; and
  • Whether all of the technical requirements listed under Items 1–5 are mandatory and must be fulfilled, or whether compliance with any one or a combination of these items would be considered sufficient.

With reference to Section 17 of the TOR:

  • Separate reference projects: No. A separate and different reference project is not required for each technical requirement.
  • One project covering multiple requirements: Yes. A single reference project may demonstrate compliance with several requirements, provided the relevant services were included in the Consultant’s scope and are clearly documented and verifiable.
  • Cumulative experience: Yes. The requirements may be satisfied cumulatively through several reference projects. However, the minimum of two separate successfully completed relevant assignments within the last ten years remains applicable.
  • Mandatory requirements: All technical requirements under Items 1–5 are mandatory and must be demonstrated collectively through the submitted references. Meeting only one or some items is insufficient. Full power-generation/transmission experience is required only if Option E2 is activated.

All other requirements of Section 17 remain unchanged.

نوي اعلانونه

چهارشنبه ۱۴۰۵/۶/۲۵ - ۸:۵۱
Background image

Clarification#1 about Upgrading of Dahla Multipurpose Dam project

Assignment Title: Review, Verification and Technical Certification of the Detailed Design of Dahla Dam Raising, Two Spillway Packages, Six Saddle Dams and Associated Work

 

Project ID . . .

یکشنبه ۱۴۰۵/۶/۲۲ - ۱۵:۵۴
Background image

د پوهاوي پیغام ⚠️🚿📢💭🚦

د روان ۱۴۰۵ هجري لمریز کال د وږي د میاشتې له ۲۳ نېټې څخه تر ۲۵ نېټې پورې د هېواد د سیندیزو حوزو په ځينو ځایونو کې د اوبو د کچې د لوړوالي او د سېلابونو د راوتلو اټکل.

📡🌐 د اقلیمي بدلون . . .

دوشنبه ۱۴۰۵/۶/۱۶ - ۱۶:۱۰
Background image

REQUEST FOR EXPRESSION OF INTEREST

Procuring Entity

Ministry of Water and Energy of Afghanistan (MEW)

Funded By

Ministry of Finance of the Islamic Emirate of . . .

Back to announcements

User account menu